Budget impact
How structural information should influence the cost worksheet.
Good structural content makes the calculator more useful because it tells the buyer which line items are product facts and which line items need local verification. The larger 3L plan can be attractive for family use, rental income, or replacement housing, but the installed budget is still only trustworthy when the structural and site-work lanes are separated.
Factory packageUse the R-22345 model path and product quote as the factory package line, not as the total project price.
Foundation and anchorageKeep local structural foundation review, anchorage, drainage, and soil assumptions in their own line.
Setting accessConfirm truck route, staging, crane reach, overhead obstructions, and final placement before tightening freight and setting cost.
UtilitiesSeparate water, sewer, electrical, gas or all-electric choices, trenching, panel capacity, and meter work from the model packet.
Permit reviewFactory-built housing documentation helps the review conversation, but local authority review remains a real project step.
ContingencyUse contingency until the lot, foundation, utilities, and local permit path are confirmed by the project team.